Home /Search
Search datasets
We have found 20 datasets for the keyword "ceramic". You can continue exploring the search results in the list below.
Datasets: 104,050
Contributors: 42
Results
20 Datasets, Page 1 of 2
OIC - Quartz Mining Act
Orders in Council (OIC) are regulations or legislative orders in relation to and authorized by an existing Act. This table identifies Yukon lands withdrawn from disposal, usually by Territorial Order in Council. In Corporate Spatial Warehouse (CSW) data is split out into spatial views by Act under which orders are authorized. The tables are comprehensive and include both active and expired orders. Spatial views show only the active data.In this table and spatial views, Regulations by Order in Council (OIC) are spatially represented to provide clarity regarding Yukon lands withdrawn from disposal. Spatial data is viewed by the Act under which the order is authorized. Not all orders are for withdrawal, different levels of withdrawal are common and not detailed in GIS attributes. It is important to read OIC documents for specific details ( [https://legislation.yukon.ca/legislation/page_a.html](https://legislation.yukon.ca:443/legislation/page_a.html) ).Distributed from [GeoYukon](https://yukon.ca/geoyukon) by the [Government of Yukon](https://yukon.ca/maps) . Discover more digital map data and interactive maps from Yukon's digital map data collection.For more information: [geomatics.help@yukon.ca](mailto:geomatics.help@yukon.ca)
Crop (corn) heat units
Crop Heat Units (CHU) are calculated on a daily basis, using the maximum and minimum temperatures in order to account for a crop’s negative response to higher temperatures.The formula used to calculate the CHU value for a day is: (1.8 × (Minimum Temperature − 4.4) + 3.33 × (Maximum Temperature − 10) − 0.084 × (Maximum Temperature − 10)²) ÷ 2.0CHU values are only accumulated during the Growing Season, April 1 through October 31.
Natural Gas Processing Plants - North American Cooperation on Energy Information
Facilities designed to recover natural gas liquids from a stream of natural gas. These facilities control the quality of the natural gas to be marketed.Mapping Resources implemented as part of the North American Cooperation on Energy Information (NACEI) between the Department of Energy of the United States of America, the Department of Natural Resources of Canada, and the Ministry of Energy of the United Mexican States.The participating Agencies and Institutions shall not be held liable for improper or incorrect use of the data described and/or contained herein. These data and related graphics, if available, are not legal documents and are not intended to be used as such. The information contained in these data is dynamic and may change over time and may differ from other official information. The Agencies and Institutions participants give no warranty, expressed or implied, as to the accuracy, reliability, or completeness of these data.Parent Collection:[North American Cooperation on Energy Information, Mapping Data](https://open.canada.ca/data/en/dataset/aae6619f-f9f3-435d-bc32-42decd58b674)
Productive Forest Landbase for the Cariboo Region
Productive forest land base is defined as the total Crown forest area, determined by subtracting the following from the total area of the Cariboo Natural Resource Region: * All non-Crown land * All Crown land committed to non-timber use through a Land Act designation * All non-forest Crown Land, and * All forest area classified as brush or non-commercial cover in the Forest Inventory. See the CCLUP Land Use Order Implementation Direction for more information: https://www2.gov.bc.ca/assets/gov/farming-natural-resources-and-industry/natural-resource-use/land-water-use/crown-land/land-use-plans-and-objectives/cariboo-region/cariboochilcotin-rlup/cclup_land_use_order_implementation_direction_companion.pdf
Metallic and Industrial Minerals Agreements
Metallic and Industrial Minerals Agreement feature class contains provincial extent polygon features representing Metallic and Industrial Minerals applications, agreements, leases, and licences, with varying term dates and conditions. These applications and subsequent agreements give the holder the right to explore Metallic and Industrial Minerals.
Pan-Canadian predictive model of Carbonatite-hosted REE and Nb deposits
A predictive model for Canadian carbonatite-hosted REE ± Nb deposits is presented herein. This model was developed by integrating diverse data layers derived from geophysical, geochronological, and geological sources. These layers represent the key components of carbonatite-hosted REE ± Nb mineral systems, including the source, transport mechanisms, geological traps, and preservation processes. Deep learning algorithms were employed to integrate these layers into a comprehensive predictive framework. Here is a link to the publication that describes this product: https://link.springer.com/article/10.1007/s11053-024-10369-7
Crown Land Reservations
A Crown land reservation is a tool under Section 18(c) of the Public Lands Act, to identify a management intent that will inform and provide direction to potential land users and regulatory bodies as authorized under the Public Lands Act. A reservation is not a disposition, does not grant any rights to public land or rights to access or occupy public land or rights to the resources on the land or under it. The Crown Land Reservations dataset displays reservations under application or active with their associated data attributes allowing users to view and access existing or proposed reservation information that could influence their application if a proposed activity intersects. More information can be found at www.alberta.ca/land-use-reservation-program.aspx
Designated Gas Storage Area
Designated gas storage areas are land areas designated by the Ontario Energy Board that contain geological formations used for subsurface storage of natural gas. This product requires the use of geographic information system (GIS) software.
Quartz Claims - 50k
A claim is a parcel of land located or granted for hard rock mining. A claim also includes any ditches or water rights used for mining the claim, and all other things belonging to or used in the working of the claim for mining purposes. A claim is a rectangular plot of ground that does not exceed 1,500' X 1,500'. All angles of a claim must be right angles, except in cases where a boundary line of a previously located claim is adopted as common to both locations.Distributed from [GeoYukon](https://yukon.ca/geoyukon) by the [Government of Yukon](https://yukon.ca/maps) . Discover more digital map data and interactive maps from Yukon's digital map data collection.For more information: [geomatics.help@yukon.ca](mailto:geomatics.help@yukon.ca)
Residual material collection areas
Sectors and days for collecting waste, recyclable materials and compostable materials.attributs:ID - Unique identifierDAY1 - Sector collection day (see also DAY2 and DAY3) DAY2 - Sector collection day (see also DAY1 and DAY3) DAY3 - Sector collection day (see also DAY1 and DAY3) DAY3 - Sector collection day (see also DAY1 and DAY2) CALENDAR - Hyperlink to the sector collection calendar (see also DAY1 and DAY3)**This third party metadata element was translated using an automated translation tool (Amazon Translate).**
Tell us what you think!
GEO.ca is committed to open dialogue and community building around location-based issues and
topics that matter to you.
Please send us your feedback