Home /Search
Search datasets
We have found 179 datasets for the keyword "construction routière". You can continue exploring the search results in the list below.
Datasets: 104,189
Contributors: 42
Results
179 Datasets, Page 1 of 18
Oil and Gas Road Right of Way Permits
Land authorizations representing the road right of way for road activities. The spatial data includes polygon data for approved and post-construction road rights of way collected on or after October 30, 2006. This dataset is updated nightly.
Oil and Gas Construction Corridors
Applications for spatial areas occurring on Crown land in which oil and gas activities will take place. Construction corridors allow for flexibility in the movement, placement and construction of oil and gas activity. This dataset is updated nightly.
Manitoba Capital Plans Project Status
This dataset contains points showing the locations of the Manitoba Infrastructure's (MI) approved, new, and continuing capital projects for the year 2021/2022. Examples of MI's capital projects are asphalt surface treatment, grading, bituminous rehabilitation, concrete reconstruction, culvert jacking, intersection improvement, structures improvement, traffic signal improvements, and traffic safety improvements.This dataset contains points showing the locations of the capital projects such as asphalt surface treatment, grading, bituminous rehabilitation, concrete reconstruction, culvert jacking, intersection improvement, structures improvement, traffic signal improvements, and traffic safety improvements. This dataset was created by digitizing high-resolution imagery of Manitoba road network, bridge sites, and culvert locations. The details of the capital projects are available as attributes of the dataset. Fields included ( Alias (Field Name): Field description.) ObjectID (OBJECTID): Sequential unique whole numbers that are automatically generated Project # (Project__): A unique ID assigned to a project by MI Capital Project Team. Hwy (Hwy): The highway number where the project is located. Location Description (Location_Description): A detailed description of the project location. Project Distance in km (km): The physical length of the project Project Type (Project_Type): A particular category assigned to the project based on the nature of work. Total Project Status (Total_Project_Status): Current total status of the project (e.g. new, continue, etc.) Construction Project Status (Construction_Project_Status): Current phase of project (e.g. construction phase, engineering design phase, etc.) Anticipated Construction Start Date (Anticipated_Construction_Start_): The expected construction start date for the project. Anticipated Construction Complete Date (Anticipated_Construction_Comple): The expected construction completion date for the project. Municipality Name (MUNI_NAME): The name of the municipality where the project is located. Department Program (Department_Program): The name of the MI department responsible for the project. This dataset is used in Manitoba Infrastructure Projects an interactive map that shows Manitoba infrastructure's new, approved, and continuing capital project locations.
Structure
STR - Facilities and structures (structure)Man-made construction. For example, resources describing buildings, museums, churches, schools, hospitals, factories, housing, monuments, and towers.
Manitoba Highway Inventory 2017
An accurate depiction of road structure construction history of the Highway Network in Manitoba.Manitoba Infrastructure --> Highway Engineering--> Highway Planning and Design (HPD) manages the Highway Inventory System (HIS). This system tracks road structure and construction history of Manitoba's Road Network. Published annually, this layer aids provincial engineers in planning and managing construction projects, both present and future. The department’s linear referencing system (LRS) uses control sections as a linear referencing method (LRM). These control section are further divided into subsections. It is on these subsections that road structure and construction history are tracked in the highway inventory system database. Please note that this feature layer primarily contains only the roads Manitoba Infrastructure is responsible for, i.e. Provincial Trunk Highways, Provincial Roads and Access Roads. It does not include municipal mile or grid roads. However, you may also see Earth Roads (under construction) or Other roads (such as those passing through national parks and are federal responsibility). A newer version of this data is available: Manitoba Highway Inventory 2018. Field List - FIELD NAME (Field Alias (i.e. display name)) in parenthesis) OBJECTID (OBJECTID) - Sequential, unique whole numbers are automatically generated.SHAPE (SHAPE) - A field to hold geometry information. ID (ID) - Oracle's unique identifierCS_ID (Control Section ID) - Non unique identifier linking segment to its respective control section. For example, a control section may have numerous geometry segments and each will have the same CS_ID.CS_KEY (Control Section Key) - An information rich key containing Region (two digits), Road Number (three digits), Section number (three digits), the Road Type (one character), and direction of travel (one character). SS_ID (Subsection ID) - Control Sections are further divided into Subsections. This is the subsection ID field.REGION_NO (MI Region) - The Manitoba Infrastructure region the segment is in Regions 1-5.ROAD_NO (Road Number) - The road number. Note co-routes will have the lesser highway number. SECTION_NO (Section Number) - The section number from the CS_KEY.ROAD_TYPE (Road Type) - H = Highway, E = Earth Road, and O= 'Other" road (such as through a national park because the road is not a responsibility of MI.) ROAD_DIRECTION (Road Direction) - A = ahead direction on a divided highway (i.e. following the digitizing direction), B = Back direction on a divided highway (i.e. against the digitizing direction, and U= an undivided highway.START_KM (Start Kilometre (KM)) - Start KM, is the start of the sub section within a control Section. This is part of the linear referencing method used for dynamic segmentation.END_KM (End Kilometre (KM)) - End KM is the end of the sub section within a Control Section. This is part of the linear referencing method used for dynamic segmentation.LENGTH_KM (Length (KM)) - End Kilometre minus the Start Kilometre.SECTION_DESC (Subsection Description) - A text description of where the subsection starts and ends. ROAD_TYPE_DESC (Road Type Description) - An unabbreviated version of Road Type above.ROAD_DIRECTION_DESC (Road Direction Description) - An unabbreviated version of Road Direction above.FUNCTIONAL_CLASS (Functional Class) - Functional Class: Expressway, Primary Arterial, Secondary Arterial and CollectorDIVIDED_STATUS (Divided Status) - Highway is divided or undivided. LANES (Number of Lanes) - The number of lanes the road has. MEDIAN_TYPE (Median Type) - Type of median: Raised Median, Depressed Median, Flush Median, Barrier and No Median.MEDIAN_WIDTH (Median Width (m)) - The width of the median, in metres.ROW_WIDTH (Row Width (m)) - The total width of the right-of-way in metres.SUBGRADE_WIDTH (Subgrade Width (m)) - The width of the earth embankment in metres. REGRADE_YEAR (Re-grade Year) - The year the road was last regraded.REGRADE_DESCRIPTION (Re-grade Description) - Description of what re-grading was done.OUTSIDE_SHLDR_TYPE (Outside Shoulder Type) - Type of outside shoulder: AST, Curbed, Fully Paved, Gravel, No Shoulders and N/A.OUTSIDE_SHLDR_WIDTH (Outside Shoulder Width (m)) - The width of the outside shoulder in metres.OUTSIDE_PAVED_WIDTH (Outside Paved Width (m)) - The width of the paved surface of the outside shoulder in metres.INSIDE_SHLDR_TYPE (Inside Shoulder Type) - Type of inside shoulder: Curbed, Fully Paved, Gravel, No Shoulders and N/A.INSIDE_SHLDR_WIDTH (Inside Shoulder Width (m)) - The width of the inside shoulder in metres.INSIDE_PAVED_WIDTH (Inside Paved Width (m)) - The width of the paved surface of the inside shoulder in metres.SURFACE_TYPE (Surface Type) - The type of surfacing on the road: A Base, AST, Bituminous (Bpm), Bituminous B, Bituminous C, C Base, Concrete, Granular, Reclaimed Asphalt Pavement and Road MixSURFACE_WIDTH (Surface Width (m)) - The surface width is the width of the driving lanes.SURFACE_DEPTH (Surface Depth (mm)) - Thickness of the surface layer (mm).SURFACE_YEAR (Surface Year) - The year the surface was constructed.BASE_1 (Base Layer 1) - 1st subsurface layer. 1 = present, 0 = not presentBASE_1_TYPE (Base Layer 1 Type) - Material type of 1st subsurface layer of the road structure.BASE_1_DEPTH (Base Layer 1 Depth (mm)) - Thickness of 1st subsurface layer of road structure in mm.BASE_1_YEAR (Base Layer 1 Year) - Year materials placed or modified for 1st subsurface layer.BASE_2 (Base Layer 2) - 2nd subsurface layer. 2 = present, 0 = not presentBASE_2_TYPE (Base Layer 2 Type) - Material type of 2nd subsurface layer of road structure.BASE_2_DEPTH (Base Layer 2 Depth (mm)) - Thickness of 2nd subsurface layer of road structure in mm.BASE_2_YEAR (Base Layer 2 Year) - Year materials placed or modified for 2nd subsurface layer.BASE_3 (Base Layer 3) - 3rd subsurface layer. 3 = present, 0 = not presentBASE_3_TYPE (Base Layer 3 Type) - Material type of 3rd subsurface layer of road structure.BASE_3_DEPTH (Base Layer 3 Depth (mm)) - Thickness of 3rd subsurface layer of road structure in mm.BASE_3_YEAR (Base Layer 3 Year) - Year materials placed or modified for 3rd subsurface layer.BASE_4 (Base Layer 4) - 4th subsurface layer. 4 = present, 0 = not presentBASE_4_TYPE (Base Layer 4 Type) - Material type of 4th subsurface layer of road structure.BASE_4_DEPTH (Base Layer 4 Depth (mm)) - Thickness of 4th subsurface layer of road structure in mm.BASE_4_YEAR (Base Layer 4 Year) - Year materials placed or modified for 4th subsurface layer.BASE_5 (Base Layer 5) - 5th subsurface layer. 5 = present, 0 = not presentBASE_5_TYPE (Base Layer 5 Type) - Material type of 5th subsurface layer of road structure.BASE_5_DEPTH (Base Layer 5 Depth (mm)) - Thickness of 5th subsurface layer of road structure in mm.BASE_5_YEAR (Base Layer 5 Year) - Year materials placed or modified for 5th subsurface layer.BASE_6 (Base Layer 6) - 6th subsurface layer. 6 = present, 0 = not presentBASE_6_TYPE (Base Layer 6 Type) - Material type of 6th subsurface layer of road structure.BASE_6_DEPTH (Base Layer 6 Depth (mm)) - Thickness of 6th subsurface layer of road structure in mm.BASE_6_YEAR (Base Layer 6 Year) - Year materials placed or modified for 6th subsurface layer.BASE_7 (Base Layer 7) - 7th subsurface layer. 7 = present, 0 = not presentBASE_7_TYPE (Base Layer 7 Type) - Material type of 7th subsurface layer of road structure.BASE_7_DEPTH (Base Layer 7 Depth (mm)) - Thickness of 7th subsurface layer of road structure in mm.BASE_7_YEAR (Base Layer 7 Year) - Year materials placed or modified for 7th subsurface layer.<TERRAIN_TYPE (Terrain Type) - General terrain conditions: Flat, Rolling and Rugged.CONSTRUCTION_STATUS (Construction Status) - Construction completed or carried over.UPDATED_YYYYMMDD (Updated Date) - Date the record was updated.SHAPE_Length (Length) - Segment length, automatically generated by ArcGIS.
Manitoba Highway Inventory 2018
An accurate depiction of road structure construction history of the Highway Network in Manitoba.Manitoba Infrastructure, Highway Engineering, Highway Planning and Design (HPD) manages the Highway Inventory System (HIS). This system tracks road structure and construction history of Manitoba's Road Network. Published annually, this layer aids provincial engineers in planning and managing construction projects, both present and future. The department’s linear referencing system (LRS) uses control sections as a linear referencing method (LRM). These control section are further divided into subsections. It is on these subsections that road structure and construction history are tracked in the highway inventory system database.Please note that this feature layer primarily contains only the roads Manitoba Infrastructure is responsible for, i.e. Provincial Trunk Highways, Provincial Roads and Access Roads. It does not include municipal mile or grid roads. However, you may also see Earth Roads (under construction) or Other roads (such as those passing through national parks and are federal responsibility).Fields included (Alias (Field Name): Field description.) OBJECTID (OBJECTID): Sequential, unique whole numbers are automatically generated. SHAPE (SHAPE): A field to hold geometry information. ID (ID): Oracle's unique identifier Control Section ID (CS_ID): Non unique identifier linking segment to its respective control section. For example, a control section may have numerous geometry segments and each will have the same CS_ID. Control Section Key (CS_KEY): An information rich key containing Region (two digits), Road Number (three digits), Section number (three digits), the Road Type (one character), and direction of travel (one character). Subsection ID (SS_ID): Control Sections are further divided into Subsections. This is the subsection ID field. MI Region (REGION_NO): The Manitoba Infrastructure region the segment is in Regions 1-5. Road Number (ROAD_NO): The road number. Note co-routes will have the lesser highway number. Section Number (SECTION_NO): The section number from the CS_KEY. Road Type (ROAD_TYPE): H = Highway, E = Earth Road, and O= 'Other" road (such as through a national park because the road is not a responsibility of MI.) Road Direction (ROAD_DIRECTION): A = ahead direction on a divided highway (i.e. following the digitizing direction), B = Back direction on a divided highway (i.e. against the digitizing direction, and U= an undivided highway. Start Kilometre (KM) (START_KM): Start KM, is the start of the sub section within a control Section. This is part of the linear referencing method used for dynamic segmentation. End Kilometre (KM) (END_KM): End KM is the end of the sub section within a Control Section. This is part of the linear referencing method used for dynamic segmentation. Length (KM) (LENGTH_KM): End Kilometre minus the Start Kilometre. Subsection Description (SECTION_DESC): A text description of where the subsection starts and ends. Road Type Description (ROAD_TYPE_DESC): An unabbreviated version of Road Type above. Road Direction Description (ROAD_DIRECTION_DESC): An unabbreviated version of Road Direction above. Functional Class (FUNCTIONAL_CLASS): Functional Class: Expressway, Primary Arterial, Secondary Arterial and Collector Divided Status (DIVIDED_STATUS): Highway is divided or undivided. Number of Lanes (LANES): The number of lanes the road has. Median Type (MEDIAN_TYPE): Type of median: Raised Median, Depressed Median, Flush Median, Barrier and No Median. Median Width (m) (MEDIAN_WIDTH): The width of the median, in metres. Row Width (m) (ROW_WIDTH): The total width of the right-of-way in metres. Subgrade Width (m) (SUBGRADE_WIDTH): The width of the earth embankment in metres. Re-grade Year (REGRADE_YEAR): The year the road was last regraded. Re-grade Description (REGRADE_DESCRIPTION): Description of what re-grading was done. Outside Shoulder Type (OUTSIDE_SHLDR_TYPE): Type of outside shoulder: AST, Curbed, Fully Paved, Gravel, No Shoulders and N/A. Outside Shoulder Width (m) (OUTSIDE_SHLDR_WIDTH): The width of the outside shoulder in metres. Outside Paved Width (m) (OUTSIDE_PAVED_WIDTH): The width of the paved surface of the outside shoulder in metres. Inside Shoulder Type (INSIDE_SHLDR_TYPE): Type of inside shoulder: Curbed, Fully Paved, Gravel, No Shoulders and N/A. Inside Shoulder Width (m) (INSIDE_SHLDR_WIDTH): The width of the inside shoulder in metres. Inside Paved Width (m) (INSIDE_PAVED_WIDTH): The width of the paved surface of the inside shoulder in metres. Surface Type (SURFACE_TYPE): The type of surfacing on the road: A Base, AST, Bituminous (Bpm), Bituminous B, Bituminous C, C Base, Concrete, Granular, Reclaimed Asphalt Pavement and Road Mix Surface Width (m) (SURFACE_WIDTH): The surface width is the width of the driving lanes. Surface Depth (mm) (SURFACE_DEPTH): Thickness of the surface layer (mm). Surface Year (SURFACE_YEAR): The year the surface was constructed. Base Layer 1 (BASE_1): 1st subsurface layer. 1 = present, 0 = not present Base Layer 1 Type (BASE_1_TYPE): Material type of 1st subsurface layer of the road structure. Base Layer 1 Depth (mm) (BASE_1_DEPTH): Thickness of 1st subsurface layer of road structure in mm. Base Layer 1 Year (BASE_1_YEAR): Year materials placed or modified for 1st subsurface layer. Base Layer 2 (BASE_2): 2nd subsurface layer. 2 = present, 0 = not present Base Layer 2 Type (BASE_2_TYPE): Material type of 2nd subsurface layer of road structure. Base Layer 2 Depth (mm) (BASE_2_DEPTH): Thickness of 2nd subsurface layer of road structure in mm. Base Layer 2 Year (BASE_2_YEAR): Year materials placed or modified for 2nd subsurface layer. Base Layer 3 (BASE_3): 3rd subsurface layer. 3 = present, 0 = not present Base Layer 3 Type (BASE_3_TYPE): Material type of 3rd subsurface layer of road structure. Base Layer 3 Depth (mm) (BASE_3_DEPTH): Thickness of 3rd subsurface layer of road structure in mm. Base Layer 3 Year (BASE_3_YEAR): Year materials placed or modified for 3rd subsurface layer. Base Layer 4 (BASE_4): 4th subsurface layer. 4 = present, 0 = not present Base Layer 4 Type (BASE_4_TYPE): Material type of 4th subsurface layer of road structure. Base Layer 4 Depth (mm) (BASE_4_DEPTH): Thickness of 4th subsurface layer of road structure in mm. Base Layer 4 Year (BASE_4_YEAR): Year materials placed or modified for 4th subsurface layer. Base Layer 5 (BASE_5): 5th subsurface layer. 5 = present, 0 = not present Base Layer 5 Type (BASE_5_TYPE): Material type of 5th subsurface layer of road structure. Base Layer 5 Depth (mm) (BASE_5_DEPTH): Thickness of 5th subsurface layer of road structure in mm. Base Layer 5 Year (BASE_5_YEAR): Year materials placed or modified for 5th subsurface layer. Base Layer 6 (BASE_6): 6th subsurface layer. 6 = present, 0 = not present Base Layer 6 Type (BASE_6_TYPE): Material type of 6th subsurface layer of road structure. Base Layer 6 Depth (mm) (BASE_6_DEPTH): Thickness of 6th subsurface layer of road structure in mm. Base Layer 6 Year (BASE_6_YEAR): Year materials placed or modified for 6th subsurface layer. Base Layer 7 (BASE_7): 7th subsurface layer. 7 = present, 0 = not present Base Layer 7 Type (BASE_7_TYPE): Material type of 7th subsurface layer of road structure. Base Layer 7 Depth (mm) (BASE_7_DEPTH): Thickness of 7th subsurface layer of road structure in mm. Base Layer 7 Year (BASE_7_YEAR): Year materials placed or modified for 7th subsurface layer. Terrain Type (TERRAIN_TYPE): General terrain conditions: Flat, Rolling and Rugged. Construction Status (CONSTRUCTION_STATUS): Construction completed or carried over. Updated Date (UPDATED_YYYYMMDD): Date the record was updated.
Works
Work in progress during the current day on the territory of the City of Sherbrooke.attributs:ID - Unique identifierMunicipality - Municipality codeType - Type of workSub-type - Sub-type of workDescription - Description of the workDescription - Description of the workDescription - Description of the workConstruction - Construction unit - Unit of realization of the workLocation - Unit of realization of the workLocation - Street affected by the workIntersection - Intersection affected by the worksCivic number - Civic number concerned by the worksCivic number concerned by the worksCivic number concerned by the worksCivic number concerned by the worksConstruction - Unit of completion of the workLocation - Street affected by the workIntersection - Intersection affected by the worksNo_Civic - Civic number concerned by the worksCivic number concerned by the worksCivic number concerned by the worksCivic number concerned Voie_de - Cross lane from which the street is affected (see LOCATION) WAY_A - Cross lane up to which the street is affected (see LOCATION) DATE_START - Construction start date (UTC or local depending on the various formats offered) DATE_END - Construction end date (UTC or local depending on the various formats offered) TRAFFIC - Effect on trafficSignaler - Presence of signalersPresence of signalsSpeed - Modification of the speed limitSpeed - Modification of the speed limitPolice - Increased police presenceCoureWater - Cutoff in the drinking water supplyPerteAccess - Temporary loss of access to vehicle entrancesCommon transport - Possible disruption of public transitSchool - Presence of a school or school corridorCommerce - Presence of businessesSubsequent workSubsequent work - Planned subsequent workNote - Additional clarificationsDebuthe date - Construction start date (Eastern time) “YYYY-MM-DD HH:MM"datefinHE - Date of completion of work (Eastern time) “YYYY-MM-DD hh:mm”**This third party metadata element was translated using an automated translation tool (Amazon Translate).**
Manitoba Highway Inventory 2016
An accurate depiction of road structure construction history of the Highway Network in Manitoba.Manitoba Infrastructure --> Highway Engineering--> Highway Planning and Design (HPD) manages the Highway Inventory System (HIS). This system tracks road structure and construction history of Manitoba's Road Network. Published annually, this layer aids provincial engineers in planning and managing construction projects, both present and future. The department’s linear referencing system (LRS) uses control sections as a linear referencing method (LRM). These control section are further divided into subsections. It is on these subsections that road structure and construction history are tracked in the highway inventory system database. This is the first year that HPD is making its annual HIS export available to the public. Please note that this feature layer primarily contains only the roads Manitoba Infrastructure is responsible for, i.e. Provincial Trunk Highways, Provincial Roads and Access Roads. It does not include municipal mile or grid roads. However, you may also see Earth Roads (under construction) or Other roads (such as those passing through national parks and are federal responsibility). A newer version of this data is available: Manitoba Highway Inventory 2018. Field List - FIELD NAME (Field Alias (i.e. display name)) in parenthesis) OBJECTID (OBJECTID) - Sequential, unique whole numbers are automatically generated. SHAPE (SHAPE) - A field to hold geometry information. ID (ID) - Oracle's unique identifier CS_ID (Control Section ID) - Non unique identifier linking segment to its respective control section. For example, a control section may have numerous geometry segments and each will have the same CS_ID. CS_KEY (Control Section Key) - An information rich key containing Region (two digits), Road Number (three digits), Section number (three digits), the Road Type (one character), and direction of travel (one character). SS_ID (Subsection ID) - Control Sections are further divided into Subsections. This is the subsection ID field. REGION_NO (MI Region) - The Manitoba Infrastructure region the segment is in Regions 1-5. ROAD_NO (Road Number) - The road number. Note co-routes will have the lesser highway number. SECTION_NO (Section Number) - The section number from the CS_KEY. ROAD_TYPE (Road Type) - H = Highway, E = Earth Road, and O= 'Other" road (such as through a national park because the road is not a responsibility of MI.) ROAD_DIRECTION (Road Direction) - A = ahead direction on a divided highway (i.e. following the digitizing direction), B = Back direction on a divided highway (i.e. against the digitizing direction, and U= an undivided highway. START_KM (Start Kilometre (KM)) - Start KM, is the start of the sub section within a control Section. This is part of the linear referencing method used for dynamic segmentation. END_KM (End Kilometre (KM)) - End KM is the end of the sub section within a Control Section. This is part of the linear referencing method used for dynamic segmentation. LENGTH_KM (Length (KM)) - End Kilometre minus the Start Kilometre. SECTION_DESC (Subsection Description) - A text description of where the subsection starts and ends. ROAD_TYPE_DESC (Road Type Description) - An unabbreviated version of Road Type above. ROAD_DIRECTION_DESC (Road Direction Description) - An unabbreviated version of Road Direction above. FUNCTIONAL_CLASS (Functional Class) - Functional Class: Expressway, Primary Arterial, Secondary Arterial and Collector DIVIDED_STATUS (Divided Status) - Highway is divided or undivided. LANES (Number of Lanes) - The number of lanes the road has. MEDIAN_TYPE (Median Type) - Type of median: Raised Median, Depressed Median, Flush Median, Barrier and No Median. MEDIAN_WIDTH (Median Width (m)) - The width of the median, in metres. ROW_WIDTH (Row Width (m)) - The total width of the right-of-way in metres. SUBGRADE_WIDTH (Subgrade Width (m)) - The width of the earth embankment in metres. REGRADE_YEAR (Re-grade Year) - The year the road was last regraded. REGRADE_DESCRIPTION (Re-grade Description) - Description of what re-grading was done. OUTSIDE_SHLDR_TYPE (Outside Shoulder Type) - Type of outside shoulder: AST, Curbed, Fully Paved, Gravel, No Shoulders and N/A. OUTSIDE_SHLDR_WIDTH (Outside Shoulder Width (m)) - The width of the outside shoulder in metres. OUTSIDE_PAVED_WIDTH (Outside Paved Width (m)) - The width of the paved surface of the outside shoulder in metres. INSIDE_SHLDR_TYPE (Inside Shoulder Type) - Type of inside shoulder: Curbed, Fully Paved, Gravel, No Shoulders and N/A. INSIDE_SHLDR_WIDTH (Inside Shoulder Width (m)) - The width of the inside shoulder in metres. INSIDE_PAVED_WIDTH (Inside Paved Width (m)) - The width of the paved surface of the inside shoulder in metres. SURFACE_TYPE (Surface Type) - The type of surfacing on the road: A Base, AST, Bituminous (Bpm), Bituminous B, Bituminous C, C Base, Concrete, Granular, Reclaimed Asphalt Pavement and Road Mix SURFACE_WIDTH (Surface Width (m)) - The surface width is the width of the driving lanes. SURFACE_DEPTH (Surface Depth (mm)) - Thickness of the surface layer (mm). SURFACE_YEAR (Surface Year) - The year the surface was constructed. BASE_1 (Base Layer 1) - 1st subsurface layer. 1 = present, 0 = not present BASE_1_TYPE (Base Layer 1 Type) - Material type of 1st subsurface layer of the road structure. BASE_1_DEPTH (Base Layer 1 Depth (mm)) - Thickness of 1st subsurface layer of road structure in mm. BASE_1_YEAR (Base Layer 1 Year) - Year materials placed or modified for 1st subsurface layer. BASE_2 (Base Layer 2) - 2nd subsurface layer. 2 = present, 0 = not present BASE_2_TYPE (Base Layer 2 Type) - Material type of 2nd subsurface layer of road structure. BASE_2_DEPTH (Base Layer 2 Depth (mm)) - Thickness of 2nd subsurface layer of road structure in mm. BASE_2_YEAR (Base Layer 2 Year) - Year materials placed or modified for 2nd subsurface layer. BASE_3 (Base Layer 3) - 3rd subsurface layer. 3 = present, 0 = not present BASE_3_TYPE (Base Layer 3 Type) - Material type of 3rd subsurface layer of road structure. BASE_3_DEPTH (Base Layer 3 Depth (mm)) - Thickness of 3rd subsurface layer of road structure in mm. BASE_3_YEAR (Base Layer 3 Year) - Year materials placed or modified for 3rd subsurface layer. BASE_4 (Base Layer 4) - 4th subsurface layer. 4 = present, 0 = not present BASE_4_TYPE (Base Layer 4 Type) - Material type of 4th subsurface layer of road structure. BASE_4_DEPTH (Base Layer 4 Depth (mm)) - Thickness of 4th subsurface layer of road structure in mm. BASE_4_YEAR (Base Layer 4 Year) - Year materials placed or modified for 4th subsurface layer. BASE_5 (Base Layer 5) - 5th subsurface layer. 5 = present, 0 = not present BASE_5_TYPE (Base Layer 5 Type) - Material type of 5th subsurface layer of road structure. BASE_5_DEPTH (Base Layer 5 Depth (mm)) - Thickness of 5th subsurface layer of road structure in mm. BASE_5_YEAR (Base Layer 5 Year) - Year materials placed or modified for 5th subsurface layer. BASE_6 (Base Layer 6) - 6th subsurface layer. 6 = present, 0 = not present BASE_6_TYPE (Base Layer 6 Type) - Material type of 6th subsurface layer of road structure. BASE_6_DEPTH (Base Layer 6 Depth (mm)) - Thickness of 6th subsurface layer of road structure in mm. BASE_6_YEAR (Base Layer 6 Year) - Year materials placed or modified for 6th subsurface layer. BASE_7 (Base Layer 7) - 7th subsurface layer. 7 = present, 0 = not present BASE_7_TYPE (Base Layer 7 Type) - Material type of 7th subsurface layer of road structure. BASE_7_DEPTH (Base Layer 7 Depth (mm)) - Thickness of 7th subsurface layer of road structure in mm. BASE_7_YEAR (Base Layer 7 Year) - Year materials placed or modified for 7th subsurface layer.TERRAIN_TYPE (Terrain Type) - General terrain conditions: Flat, Rolling and Rugged. CONSTRUCTION_STATUS (Construction Status) - Construction completed or carried over. UPDATED_YYYYMMDD (Updated Date) - Date the record was updated. SHAPE_Length (Length) - Segment length, automatically generated by ArcGIS.
The State of Mass Timber in Canada
The SMTC map and database provides the location of, and information about completed, under construction, or planned mass timber projects and manufacturing facilities in Canada. Project information includes building size, height, occupancy, mass timber materials used, year of construction, and other criteria. Manufacturer information includes facility location, materials produced, and production capacity.
Historical DriveBC Events
This annually updated dataset provides all of the previously published road conditions, traffic incidents, and current and planned road construction activities as published on [DriveBC web site](http://drivebc.ca/) beginning with 2006. Current information on DriveBC road events is available via the [Open511-DriveBC API](https://catalogue.data.gov.bc.ca/dataset/open511-drivebc-api).
Tell us what you think!
GEO.ca is committed to open dialogue and community building around location-based issues and
topics that matter to you.
Please send us your feedback